Iran Neurological Hospital

Supply and equipment of advanced automatic fire alarm system with analog / digital addressing capability.
Highly advanced laser detector
Highly advanced LHD cable detector
The first phase of Razavi Hospital was inaugurated in February 2005 in Mashhad. This hospital has been built on a 39-hectare land with an infrastructure of about 56,000 square meters on 5 floors. 36 hectares of this space is considered green space.
The second phase of Razavi Hospital was inaugurated on September 21, 2013. This building was designed and built by an Iranian-German team, this building is resistant to fire and earthquakes of more than 8 Richter.
Phase 2 of Razavi Hospital has 40,000 square meters of infrastructure and is on 6 floors and is equipped with 17 advanced operating rooms and 18 hospital rooms.